
Industrial High-Speed Fold-Up Door
A stacking PVC curtain with reinforcement for large openings and wind-exposed applications.
Add to project RFQTechnical review — final configuration requires confirmation.
Fold-up doors in context
Explore the appearance, arrangement and details for your project brief.

A row of exterior fold-up doors
View full image
Blue fold-up curtain and lifting straps
View full image
Fold-up door structure — supplier diagram
View full imageSupplier reference imagery, used with permission. Shown configurations are illustrative; final materials, components and suitability are confirmed for each project.
Technical selection data
Catalogue values for technical review. Ratings and applicability must be confirmed for the selected configuration.
| Parameter | Selection data |
|---|---|
| Opening/closing speed | 0.6-1.5 m/s |
| Power supply | 220 V / 380 V optional |
| Maximum size | 15000 × 10000 mm |
| Control | Variable frequency |
| Service life (source label) | ≥100,000 cycles/year |
| Wind resistance (source rating) | Up to level 10 |
| Safety standard | To Be Confirmed |
Technical items to confirm
Source refers to relevant EN safety requirements without identifying a standard or certificate. Compliance and wind-rating test basis: To Be Confirmed. The annual cycle figure is labeled Service Life in the source; rating definition: To Be Confirmed.
Source: JBL Entrance_Door Systems Catalogue_V1.0 · pages 6, 7. Confirm final specifications and suitability for your project.
Configuration & finishes
Structure and options
PVC curtain with fiberglass reinforcement; reinforcing ribs; heavy-duty steel frame; servo drive; HMI control. Optional vision panels, radar, remote control and pull cord.
Colors, finishes and accessories
Grey, blue, red, yellow and white. Custom colors on request.
Application fit
Also called an industrial stacking door, this fold-up curtain arrangement is selected around opening size, headroom and project wind loads.
Large openings in logistics facilities, industrial plants and waste treatment areas.
Include project design loads, safety requirements and any specified approval documents in your enquiry.
How project coordination worksHave a drawing? Start here.
Bring your opening dimensions, quantities and project requirements.
