Equipment & interfaces
List the door system, operator, controls, safety devices and accessories. Identify building works, power connections and items supplied by others.
JBL Entrance integrates manufacturing resources, technical coordination, supply chain management, quality control and international delivery.
Give procurement, engineering and the site team the same basis for review.
List the door system, operator, controls, safety devices and accessories. Identify building works, power connections and items supplied by others.
Specify the drawings, configuration schedule, inspection records and applicable compliance documents your project requires. Confirm availability and the exact model covered before approval.
State the delivery location and target date. Agree who handles unloading, storage, installation, commissioning and final acceptance, alongside the quoted delivery terms.
A door schedule, opening drawing, installation layout or tender specification helps define the next technical questions. Mark each document as draft, for review or approved, and include its revision date.
For a replacement, include the existing model plate, photographs and the issue to resolve. For a new project, start with opening dimensions, quantities, operating conditions and project location.
Confirm the application, opening geometry, quantities, duty, environment, target date and the buyer’s specified technical requirements.
Scope to agreeProject brief and open technical questions
Review the product family, configuration, manufacturer’s relevant documents and ability to meet the specific order scope. Manufacturing is performed by the supplying manufacturer.
Scope to agreeProduct and supplier scope to confirm
Confirm interfaces, power, controls, safety devices, finishes and installation responsibilities. Record specification changes before order release.
Scope to agreeAgreed drawings and configuration
Agree inspection checkpoints, required records and acceptance criteria for the order. Any requested third-party inspection is arranged within the agreed scope.
Scope to agreeInspection and acceptance requirements
Confirm packing, shipping marks, export documents, delivery terms and handover responsibilities. Dates and commercial terms are confirmed in the quotation or order.
Scope to agreeDelivery scope and document checklist
Collect the model, order reference, photographs and a description of the issue. Coordinate review with the supplying manufacturer and track agreed corrective actions.
Scope to agreeIssue record, responsible parties and next action
Installation, commissioning, warranty, response times, site attendance and remedies are project-specific. The agreed quotation and order documents define the applicable scope.
Bring your opening dimensions, quantities and project requirements.